SAP Adaptors Configuration (Magic xpi 4.5)
The following flags provide further functionality when working with Magic xpi's SAP connectors.
|  |  | 
| SAPB1 Locking | This flag controls SAP locking. Enter N to allow more than one SAPB1 step to run simultaneously over a whole project's runtime scope. The project's ifs.ini file entry is: SAPB1Locking | 
| SAPB1 Remove Empty Nodes | This flag determines whether to remove or to retain empty nodes that may occur when configuring SAPB1 with an XML interface. Enter Y to remove empty nodes from the XML configuration. The project's ifs.ini file entry is: SAPB1RemoveEmptyNodes | 
| Rfc Allow Start Program | This flag lets you determine which programs are allowed to run on client machines. The project's ifs.ini file entry is: RfcAllowStartProgram | 
| SAPJCO | This flag determines the infrastructure that will be used for SAP R/3 implementation. The project's ifs.ini file entry is: SAPJCO | 
| Debug Trace Level | This flag adds extended trace options to the SAP R/3 connector. The project's ifs.ini file entry is: DebugTraceLevel |